Zucconi Strength & Conditioning Center
Zucconi Strength & Conditioning Center
The David J. Zucconi ’55 Varsity Strength and Conditioning Center, a 12,000-square-foot facility for varsity athletes and teams, officially opened in 2012 and underwent a major renovation in the summer of 2025.
The strength & conditioning center accommodates student-athletes from all 34 varsity sport teams and features an indoor turf area for warm-ups, pushing sleds and agility training. It has 18 multifunctional weight racks and eight pull-down and glute-ham machines, with over 400 pieces of floor equipment, including 300 dumbbells.
Brown vs Georgetown: Football Highlights
Saturday, September 20
2025 Brown Football Intro Video
Friday, September 19
Brown Stadium 100th Anniversary Podcast
Friday, September 19
The James Perry Coaches Show: Episode 1 (9-18-2025)
Thursday, September 18